Distributed photovoltaic power generation solution

03月31日

The distributed photovoltaic power system mainly uses large scale solar cell array to convert the solar energy into direct current. Through the lightning protection junction box, the multi-channel array is converge into a photovoltaic inverter. The photovoltaic inverters convert the multiple direct current into alternating current, and are allocated to the load by the AC distribution cabinet. Electricity is transported to the power grid; the insufficient part is supplemented by power grids.

Summary

Energy shortage, energy security, the rapid growth of energy prices and environmental pollution have become the primary problems that restrict the social development of many areas. The application and development of global energy are facing a huge crisis. To solve this series of problems, large-scale development and utilization of green energy is one of the important means. On the one hand, the use of green energy can effectively alleviate the problem of energy shortage and the pollution of the traditional ore fuel use to the environment. On the other hand, it can also promote the development of the local economy. Distributed photovoltaic power generation scheme is one of the most important applications of green energy.

       9.jpg 
 
  Scheme principle
 
 
 
The distributed photovoltaic power system mainly uses large scale solar cell array to convert the solar energy into direct current. Through the lightning protection junction box, the multi-channel array is converge into a photovoltaic inverter. The photovoltaic inverters convert the multiple direct current into alternating current, and are allocated to the load by the AC distribution cabinet. Electricity is transported to the power grid; the insufficient part is supplemented by power grids.
 
 
 
system composition
 
 
 
Power generation equipment (solar panels and lightning protection confluence boxes).
 
The transformation part (grid connected inverter).
 
Power distribution and metering system (AC distribution cabinet and metering meter system).
 
Energy management system (environment and site detection system, data acquisition and communication unit and background network management system).
 
Scheme bright spo
 
Green, low carbon, pollution-free and noiseless, suitable for construction in industrial parks, office buildings and residential areas.
 
Using high efficiency panel and MPPT inverter system, the solar energy utilization rate is high, and the cost of power generation is reduced.
 
The operation of the grid connected to the public power grid does not require batteries, and the cost of the system is greatly reduced.
 
PV modules are installed on idle roofs, without additional land occupation and low cost of renting roofs.
 
The system adopts hybrid power supply of solar energy and external power grid, namely, the use of power generation and utilization, the high utilization rate of power generation and shortening the investment cycle.
 
Photovoltaic power consumption in situ consumption, reduce 5%-10% transmission and distribution power loss
 
Because solar power is mainly generated during the day, the peak load of industrial parks is also in the daytime, which can effectively reduce the impact of peak load and improve the reliability of electricity consumption.
 
Application scene
 
 
The distributed photovoltaic power generation scheme is mainly for customers in industrial parks or enterprises, business and office buildings with large roofs.
 
 
A distributed photovoltaic power generation system is built on the roof to reduce the power dependence on the grid, while reducing the carbon emissions of the industrial park and creating an eco industrial park. Distributed photovoltaic power generation system will consume the largest amount of electricity locally, and only a small proportion of excess electricity will be transported to the grid. The main reason is that the price of electricity on the Internet is relatively low and the economic efficiency is poor. If all the power generation capacity can be consumed locally, the maximum economic benefits will be achieved. The system can cover 20kW to several megawatts, and can be customized according to the roof area and customer needs.
亚洲精品无码永久在线观看性色| 真人性生交免费视频| 无码国内精品人妻少妇蜜桃视频| 狠狠色综合网站久久久久久久| 少妇精品导航| 粗一硬一长一进一爽一a级| 亚洲国产精品久久久久久久| 亚洲а∨天堂久久精品2021| 亚洲精品色婷婷在线影院| 国产a在亚洲线播放| 国产爆乳无码视频在线观看3| 精品一区二区久久久久久久网站| 国产白袜脚足j棉袜在线观看| 天天干成人网| 性开放的女人aaa片| 亚洲日韩国产一区二区三区| 强奷漂亮雪白丰满少妇av| 国产精品538一区二区在线| 无码av免费一区二区三区试看| 亚洲精品亚洲人成人网| 精品欧洲av无码一区二区14| 亚洲熟妇av日韩熟妇在线| 少妇被粗大的猛烈进出动视频| 久久九九久精品国产免费直播| 久久www成人_看片免费不卡| 国产精品va无码一区二区| 国产精品免费久久久久影院仙踪林| 国产精品久久久久9999| aaaaa级少妇高潮大片免费看| 熟妇丰满多毛的大隂户| 无码熟熟妇丰满人妻啪啪| 国产av无码专区亚洲av琪琪| 性色av浪潮av色欲av| 男男gv白嫩小受gv在线播放| 免费a级毛片无码免费视频| 欧美国产日韩a在线视频| 亚洲精品国偷拍自产在线麻豆| 国产二级一片内射视频播放| 亚洲成av人片在线观看无| 国产乱子伦精品免费女| 6080yyy午夜理论片中无码|